Vessel Crews — Shipboard View
Daily tasks, noon reports, watch handovers & safety drills
Vessel
APOLLON (Kamsarmax)
Master
Capt. S. Michalopoulos
Position
25°12'N 056°06'E
Course / Speed
045° / 12.8 kn
ETA Fujairah
26 Mar 2026, 18:00
Open Tasks
6
2 urgent · 4 routine
Noon Report
Submitted
26 Mar 2026 12:00
Next Safety Drill
28 Mar
Fire & Abandon Ship
OT Hours (Mar)
42 hrs
3 crew submitted
| Task / WO Ref | Type | Priority | Assigned To | Due | Status |
|---|---|---|---|---|---|
|
ME turbocharger bearing temp check WO-2026-0342 |
Maintenance | Urgent | C/E J. dela Cruz | 26 Mar 14:00 | In Progress |
|
Prepare manifold for bunkering WO-2026-0345 |
Cargo | Urgent | Bosun E. Santos | 26 Mar 17:00 | Pending |
|
Lifeboat davit monthly inspection WO-2026-0340 |
Maintenance | Routine | 3/E R. Villanueva | 26 Mar | Completed |
|
Bridge ECDIS software update WO-2026-0348 |
Navigation | Routine | 2/O P. Reyes | 27 Mar | Pending |
|
Hold 1 bilge sounding WO-2026-0349 |
Inspection | Routine | Bosun E. Santos | 26 Mar 16:00 | Pending |
|
Fire detection system weekly test WO-2026-0346 |
Maintenance | Routine | 3/O K. Papadimitriou | 26 Mar | Completed |
Position & Navigation
Weather
Fuel & Consumption
Cargo & Stability
Master's Remarks
"Approaching Fujairah. Pilot station ETA 1800. Bunker barge confirmed. All crew briefed for port arrival."
Watch-keeper handover log — 26 Mar 2026
Handed Over By
C/O A. Nikolaidis
Received By
2/O P. Reyes
Key Items
"Noon report sent. Approaching pilot station Fujairah ETA 1800. Bunker barge confirmed."
Handed Over By
3/O K. Papadimitriou
Received By
C/O A. Nikolaidis
Key Items
"Clear weather. Course 045°, speed steady 12.8 kn. Fire detection test completed — all zones OK."
Handed Over By
2/O P. Reyes
Received By
3/O K. Papadimitriou
Key Items
"Traffic separation zone cleared at 0215. Two vessels overtaking — CPA >2nm. AIS monitoring normal."
Safety drill schedule, completed drills & incident reports
Upcoming Drills
| Drill | Date | Required Crew | Status |
|---|---|---|---|
| Fire & Abandon Ship | 28 Mar 2026 | All hands | Scheduled |
| Enclosed Space Entry Rescue | 02 Apr 2026 | Deck + Engine | Scheduled |
| Man Overboard | 10 Apr 2026 | All hands | Scheduled |
Completed Drills (Q1 2026)
| Drill | Date | Result | Notes |
|---|---|---|---|
| Fire Drill | 15 Mar 2026 | Pass | Muster time: 3 min 42 sec |
| Abandon Ship | 15 Mar 2026 | Pass | Combined with fire drill |
| Oil Spill Response | 01 Mar 2026 | Pass | SOPEP equipment checked |
| Enclosed Space Entry | 18 Feb 2026 | Pass | New procedure briefed |
Active Incidents
| Ref | Type | Date | Description | Status |
|---|---|---|---|---|
| INC-2026-012 | Near-miss | 22 Mar 2026 | Crane wire fraying detected during pre-lift check. Wire replaced. | Under Investigation |